Friday, January 25, 2008
This is What's New
The exterior is pretty much ready to be painted as soon as the temperature warms up a bit.
The half bath's subway tile wains coating is above.
Above is our mostly finished entry way (our house is filthy with sawdust).
This is Abram's (and the new baby's) bedroom wall with the built in and bath.
This is the other wall in the bedroom.
The above is one of the girl's rooms, both of their rooms are the same, just flipped.
This is the front room, and the start of that fireplace mantel.
Wednesday, January 9, 2008
Columns and Floors
Thursday, January 3, 2008
The Latest
Here is a photo update of what has been happening on Ravencrest.
The bitter cold has made the exterior slow going. Obviously, the hardy plank, shaker shingles, and the board and baton need to be painted so don't get nervous about the color variation.
The ceiling in the family room has way too many lights because the original ones were off center.
The master shower isn't quite finished but this is a preview.
Abram's shower is a light green and black.
The basement shower is white subway and noir glass.
The girls' bathroom tub surround has grape and steal blue glass.
The bitter cold has made the exterior slow going. Obviously, the hardy plank, shaker shingles, and the board and baton need to be painted so don't get nervous about the color variation.
The ceiling in the family room has way too many lights because the original ones were off center.
The master shower isn't quite finished but this is a preview.
Abram's shower is a light green and black.
The basement shower is white subway and noir glass.
The girls' bathroom tub surround has grape and steal blue glass.
Subscribe to:
Posts (Atom)